OLD MANOR HOSPITAL - Salisbury, Hampshire

This new building complex houses mental health patients in rehabilitation, elderly and acute units. Each bedroom has en suite facilities, each controlled from an ECO-Logic Multi-Channel Micro-Processor. The water systems are pressurised, and include direct WC flush (no cisterns).

The ECO-Logic Controller had separate three-way lockout switch facilities aiding security and disinfection, and controlled ECO 'Touch Sense' outlets on basins (hot & cold), WC flush and shower. Also supplied all water control valves, thermostatic mixer valves and a specially designed 'secure' hand-held shower attachment with electronic contacts. All units were commissioned by our Service Engineering Team.

Principal Design Team: Wicheloe Macfarlane MDP
Main Contractor: Dean & Dyball, Southern (Design & Build)
Client: Avon & Wiltshire NHS, Mental Health Partnership NHS Trust
Completion: October 2003